View Single Post
Old
  (#3)
Blink is Offline
Member
 
Posts: 35
Join Date: Jan 2002
Location: Adelaide
   
Default 02-22-2002, 07:25 AM

1.. Have you placed the explosives on the Railway sidding below?.

2..Have you thrown the lever in the control room overlooking the raliway line on the bridge.?

if you answered yes. the truck should be waiting in the loading area with its lights on. Get In and get ready to mow the reinforcements down.
  
Reply With Quote