Alliedassault           
FAQ Calendar
Go Back   Alliedassault > Lounge > Offtopic
Reload this Page VIETNAM IN MAPLES FOREST/BACKYARD/CREEK/347634727347butsexse
Offtopic Any topics not related to the games we cover. Doesn't mean this is a Spam-fest. Profanity is allowed, enter at your own risk.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old
  (#18)
ninty is Offline
Major General
 
ninty's Avatar
 
Posts: 12,683
Join Date: Jan 2002
Location: Calgary
   
Default 06-11-2004, 04:01 PM

Do you know how many cubic feet of dirt you have to move? Seems like a lot.

How do you get the dirt out to the top when you get really deep. You have to have some kind of bucket/lift system to get the dirt up.

I doug about 5 1/2 feet, and it was getting hard to get the dirt out. Word of advice, don't pile the dirt around the hole. You have to move it. Cause when you get deeper, you're not going to have any place to put all the dirt if its piled around the entrance. You're going to have one guy moving the dirt that is on the surface to another spot off in the distance.
  
Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



Powered by vBulletin® Version 3.8.12 by ScriptzBin
Copyright ©2000 - 2025, vBulletin Solutions Inc.
vBulletin Skin developed by: vBStyles.com
© 1998 - 2007 by Rudedog Productions | All trademarks used are properties of their respective owners. All rights reserved.